As the backbone line of Foshan's east-west direction, Foshan Metro Line 2 Wanhua Control Center is the east-west trunk line connecting the central group and the high-speed rail channel connecting Foshan and Guangzhou. Line 2 is divided into one and two phases of construction, the first phase is planned to start from Nanzhuang, passing through Nanzhuang, Shiwan, Kuiqi Road, across Dongping Waterway, Fochen Road, Wendeng Road, Linyue Road, Chencun Waterway to Guangzhou South Railway Station; The second phase of the plan extends to the west and reaches the CRRC base in Gaoming Xi'an Foshan through Xiqiao.